Policy Text:
1) Future sewage works shall be prohibited where the establishment, operation and maintenance of sewage works would be a significant drinking water threat, where the sewage works discharge is to surface water from:
a) Combined sewer discharge from a stormwater outlet to surface water; and
b) Sewage treatment plant bypass discharge to surface water, in any of the following areas:
WHPA-E (VS = 8) (future); or
In any WHPA-E in an Issue Contributing Area for Nitrates or Pathogens (future).
c) Industrial effluent discharges, in any of the following areas:
WHPA-E (VS = 8) (future); or
In any WHPA-E in an Issue Contributing Area for Nitrates, Pathogens or Chloride (future).
d) Sewage treatment plant effluent discharges (includes lagoons), in any of the following areas:
WHPA-A (future); or
WHPA-B (VS = 10) (future); or
WHPA-E (VS = 8) (future); or
In any WHPA-E in an Issue Contributing Area for Nitrates or Pathogens (future).
2) Where sewage works are in an area where the activity is a significant drinking water threat, the Environmental Compliance Approval that governs the activity shall be reviewed to ensure appropriate terms and conditions are included so that the activity ceases to be a significant drinking water threat, where the sewage works discharge is to surface water from:
a) Combined sewer discharge from a stormwater outlet to surface water; and
b) Sewage treatment plant bypass discharge to surface water, in any of the following areas:
WHPA-E (VS = 8) (existing); or
In any WHPA-E in an Issue Contributing Area for Nitrates or Pathogens (existing);
c) Industrial effluent discharges, in any of the following areas:
WHPA-E (VS = 8) (existing); or
In any WHPA-E in an Issue Contributing Area for Nitrates, Pathogens or Chloride (existing).
d) Sewage treatment plant effluent discharges (includes lagoons), in any of the following areas:
WHPA-A (existing); or
WHPA-B (VS = 10) (existing); or
WHPA-E (VS = 8) (existing); or
In any WHPA-E in an Issue Contributing Area for Nitrates or Pathogens (existing).
Timelines:
T-1: Prescribed Instruments (existing) shall be reviewed (and amended, as necessary) within 3 years of the date the Source Protection Plan takes effect, or such other date as the Director determines.
T-3: The relevant Ministry shall comply with the Prescribed Instrument policy (future) immediately upon the date the Source Protection Plan takes effect.