Policy Text:
Where a temporary waste destruction unit for PCBs is required in an area where the storage of PCB waste is, or would be, a significant drinking water threat, the Environmental Compliance Approval that governs the activity shall be reviewed or established to ensure appropriate terms and conditions are included so that the activity ceases to be, or does not become, a significant drinking water threat in any of the following areas:
WHPA-A (existing, future); or
WHPA-B (VS = 10) (existing, future); or
WHPA-E (VS = 10) (existing, future).
Timelines:
T-1: Prescribed Instruments (existing) shall be reviewed (and amended, as necessary) within 3 years of the date the Source Protection Plan takes effect, or such other date as the Director determines.
T-3: The relevant Ministry shall comply with the Prescribed Instrument policy (future) immediately upon the date the Source Protection Plan takes effect.