Policy Text:
Where sanitary sewers and related pipes are in an area where the activity is, or would be, a significant drinking water threat, the Environmental Compliance Approval that governs the activity shall be reviewed or established to ensure appropriate terms and conditions so that the activity ceases to be, or does not become, a significant drinking water threat in any of the following areas:
WHPA-A (existing, future); or
WHPA-B (VS = 10) (existing, future); or
WHPA-E (VS = 10) (existing, future); or
the remainder of an Issue Contributing Area for Nitrates or Pathogens (existing, future).
Not limiting any other conditions to be included in the Environmental Compliance Approval, the Issuing Director should include the following conditions, where possible:
requiring higher construction standards; and
inspections by the owner for leaks.
Timelines:
T-1: Prescribed Instruments (existing) shall be reviewed (and amended, as necessary) within 3 years of the date the Source Protection Plan takes effect, or such other date as the Director determines.
T-3: The relevant Ministry shall comply with the Prescribed Instrument policy (future) immediately upon the date the Source Protection Plan takes effect.