Policy Text:
To reduce the risk to drinking water from the establishment and operation of a liquid hydrocarbon pipeline where the activity would be a significant drinking water threat, this activity shall be designated for the purpose of Section 58 of the Clean Water Act, 2006 and a Risk Management Plan shall be required. The Risk Management Plan may include, but not be limited to, the following:
a. Evaluation of existing Spills Prevention Plans/ Spill Contingency Plans;
b. An evaluation of communication plans and training protocols with respect to management of a spill;
c. Additional measures to reduce the likelihood that a spill or leak would be a risk to drinking water sources; and
d. Ensure all applicable provisions of Ontario Regulations O. Reg. 210/01
e. Ensure the protection of drinking water sources by including the following;
i. Best Management Practices for spill management;
ii. proof of ability to pay for clean-up of potential contamination; and
iii. the appropriate frequency of inspections.