Policy Edit

Policy Id:

SPR/SPA:

Risk:

Implementing Body

Legal Effect

Policy Tool

Threat Type

Status

Comment

Policy Text:

For all properties located in Intake Protection Zone 1 that have systems, which include lift stations that transport human waste, the City of Timmins shall:

require facilities with sewage lift stations to have stand-by pumps and stand-by power supplies and/or approved contingency measures;

the facility must also have a monitoring/alarm system to advise the Owner/Operator in event of the failure of the equipment.

The City of Timmins is responsible for implementing this policy within two years of when the Source Protection Plan takes effect.

Monitoring Text:

P02-1958-062012-M(LS): Policy for Monitoring the Implementation of the Existing and Future Significant Threat Policies:

For all properties located in Intake Protection Zone 1, the City of Timmins shall:
a) notify the Mattagami Region Source Protection Authority when back-up pumps and back-up power supplies have been installed or when approved contingency measures
have been implemented;
b) notify the Mattagami Region Source Protection Authority when Zoning By-laws are enacted or when amendments to Zoning By-laws, which are related to this policy, have
been developed and implemented.

The City of Timmins is responsible for implementing part a) this policy within three years of when the Source Protection Plan takes effect. The City of Timmins will implement part b) of this policy as per the requirements to update the Official Plan and Zoning By-law as described in section 6.1.