Policy Edit

Policy Id:

SPR/SPA:

Risk:

Implementing Body

Legal Effect

Policy Tool

Threat Type

Status

Comment

Policy Text:

All Transport Pathways

The municipality is strongly encouraged to oversee the creation of new transport pathways (including earth energy systems) within Wellhead Protection Areas so that they do not endanger the raw water supply of a municipal drinking water system. The municipality should require the proponent to demonstrate that the municipal water supply is not endangered. Depending on the type of transport pathway, this may include the requirement for studies and inspections.
Earth Energy Systems

The municipality should address specific requirements for geothermal/earth energy systems by ensuring that building permits are issued for earth energy systems in accordance with the Ontario Building Code.
The municipality should not issue any permits for vertical closed loop earth energy systems in the WHPA A and B zones. In the WHPA C and D zones, the municipality should require that the sealing of vertical boreholes be completed in a manner similar to that required for water wells as outlined in Ontario Regulation 903.

Implementer: Municipality

Applicable Area: This policy applies to the following areas:

All Transport Pathways

WHPA A - Deloro, Madoc, Tweed, Point Anne and Peats Point.

Earth Energy Systems - Vertical Closed Loop
WHPA A and B - Deloro, Madoc, Tweed, Point Anne and Peats Point.

Earth Energy Systems Sealing Requirements - Vertical Boreholes
WHPA C and D - Deloro, Madoc, Tweed, Point Anne and Peats Point.

Tools: Transport Pathway policy pursuant to Section 27(1b) of Ontario Regulation 287/07.

Legal Effect: Strategic (See Appendix C, List J)

Effective Date: When the Plan takes effect.

Monitoring Policy (See Appendix C, List J):

Each municipality should prepare a report for the Quinte Source Protection Authority by February 1st of each year summarizing how this policy was implemented and the number of Transport Pathways that have been proposed and approved during the previous calendar year.

Monitoring Text:

Each municipality should prepare a report for the Quinte Source Protection Authority by February 1st of each year summarizing how this policy was implemented and the number of Transport Pathways that have been proposed and approved during the previous calendar year.