Policy Edit

Policy Id:

SPR/SPA:

Risk:

Implementing Body

Legal Effect

Policy Tool

Threat Type

Status

Comment

Policy Text:

The municipality shall collect raw water samples quarterly from the Belleville and Picton intakes for monitoring of parameters indicative of landfill leachate. The results are to be compared with the results of the monitoring of any offsite contamination from the former landfill sites to assist in determining if contaminants leaching from the two former landfills are present at the drinking water system intakes.

If it is determined that contaminants are reaching the intake, the municipality shall take the appropriate remedial action to prevent contamination from the former landfill site from reaching the intake and verify that the treatment processes are adequate.

Implementer: Municipality

Applicable Areas: This policy applies to the following areas:

a) Belleville IPZ 1 and 2 (Zwicks Park)

b) Picton IPZ 2 (Delhi Park)

Tools: Specify Action pursuant to Section 26(1)(v) of Ontario Regulation 287/07.

Legal Effect: Must Conform (See Appendix C, List E)

Effective Date: Within three years of the Plan taking effect.

Monitoring Policy (See Appendix C, List F):

The municipality shall:

1) Provide a report prepared by a qualified professional to the Quinte Source Protection Authority by February 1st of each year summarizing the results and analysis of the water quality monitoring, during the previous calendar year;
2) Analyze the results of the monitoring as required by Policy 1-4-E and this policy to assess if impact from the landfill site on the drinking water system is occurring. These results for the previous calendar year are to be reviewed to determine if remedial action is required.

Monitoring Text:

The municipality shall:
1) Provide a report prepared by a qualified professional to the Quinte Source Protection Authority by February 1st of each year summarizing the results and analysis of the water quality monitoring, during the previous calendar year; and
2) Analyze the results of the monitoring as required by Policy 1-4-E and this policy to assess if impact from the landfill site on the drinking water system is occurring. These results for the previous calendar year are to be reviewed to determine if remedial action is required.