Policy Id:
SPR/SPA:
Risk:
S-1
Crowe Valley, Ganaraska Region, Kawartha-Haliburton, Lower Trent, Otonabee-Peterborough
Significant
Implementing Body
Legal Effect
Policy Tool
Threat Type
Status
Comment
Alnwick/Haldimand Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Asphodel-Norwood Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
S-1(1) The Municipality assumed responsibility for septic permits and inspections on November 18, 2024. Detailed reporting on the status of inspections provided in Section 1 reporting. Through annual reporting by the Municipality and RMO, this policy has been implemented.
Brighton Municipality of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Cavan Monaghan Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
S-1(1) The Municipality assumed responsibility for new septic permits on April 1, 2024 and inspections on November 18, 2024 so annual reporting and will be completed by the Township for 2025.
Cramahe Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Douro-Dummer Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Municipality is the Principal Authority and responsible for septic inspection program.
Trent Lakes Municipality of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
The Municipality is responsible for sewage system inspections.
Hamilton Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
The Township meets the reporting requirements
Havelock-Belmont-Methuen Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Through online reporting and a summary report to the Township of Havelock-Belmont-Methuen and the Crowe Valley Conservation Authority, the details of properties and inspections required are reported in accordance with this policy.
Highlands East Municipality of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Kawartha Lakes City of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
In progress/some progress made
Inspections are being initiated for a second round in 2026 for the next cycle. Throughout the next five years all properties have been scheduled to receive a second assessment. a) all inspections have been conducted in the 2020-2025 inspection cycle; b) 0 properties have been identified as being non-compliant in 2025; c) 0 minor issues were identified (baffle repairs, lids and pump-outs) and 0 major issues (complete failures on the system) which are being corrected through permits in 2025.
Marmora and Lake Municipality of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
0 Inspections
Minden Hills Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Otonabee-South Monaghan Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
The municipality assumed responsibility for septic permits and inspections from PPH on November 18, 2024. This policy has been implemented. In 2025 it is now up to the municipality to do the annual inspections and reporting.
Peterborough City of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
S-1(1) Municipality assumed responsibility for septic permits and inspections from PPH on November 18, 2024. Reporting information includes the number and location of inspections carried out under the maintenance inspection program during the reporting year; b) The number and location of inspections that were not compliant with the septic inspection guideline; and c) For the properties identified in (b), a description of the deficiencies in the system, the orders issued by the inspector, and any follow-up with the system owner. In 2025, two site inspections were conducted for the outstanding 1297 & 1300 Dafoe Drive; 1297 was inspected and will be reinspected in 2030 but 1300 requires a spring visit in 2026 to confirm that the tank was pumped out as indicated by the landowner - snow impeded staff from inspecting tank pumped status.
Quinte West City of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Scugog Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Selwyn Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
The municipality assumed responsibility from PPH for septic permits on April 1, 2024 and November 18, 2024 for inspections. Through annual reporting and a separate annual summary provided by PPH and the Township to the Township and RMO. This policy has been implemented.
Stirling-Rawdon Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Trent Hills Municipality of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented: Policy outcome(s) evaluated - No further action(s) required
Uxbridge Township of - (Municipality)
Conform with
Specify Actions to be taken to implement plan or achieve its objectives
Future & Existing
Implemented
Policy Text:
Applicable Activities: Sewage systems as defined in section 1 of O. Reg. 350/06 (Building Code) made under the Building Code Act, 1992 that are existing significant drinking water threats or would be future significant drinking water threats.
S-1(1): Report by February 1 of each year to the applicable source protection authority on the implementation of the mandatory maintenance inspection program[1] for the preceding calendar year. The report must, at minimum, include the following information:
a) The number and location of inspections carried out under the maintenance inspection program during the reporting year;
b) The number and location of inspections that were not compliant with the septic inspection guideline; and
c) For the properties identified in (b), a description of the deficiencies in the system, the orders issued by the inspector, and any follow-up with the system owner.
S-1(2): Copy the municipality, building official, and Risk Management Official on all reporting required by Policy S-1(1) unless the municipality is the Principle Authority under the Ontario Building Code Act.
[1] The details of the inspection program are specified in the Ontario Building Code (O. Reg. 350/06) and the MMAH Sewage System Inspection Guideline
Monitoring Text:
S-1(2): Copy the municipality, building official, and Risk Management Official on all reporting required by Policy S-1(1) unless the municipality is the Principle Authority under the Ontario Building Code Act.