Policy Text:
Where existing sewage infrastructure is a significant drinking water threat the Ministry of the Environment shall ensure that the prescribed instrument (Certificate of Approval or Environmental Compliance Approval) include appropriate terms and conditions so that it ceases to be a significant drinking water threat.
The Director shall consider including conditions within the prescribed instrument to inspect sewage infrastructure to ensure it is functioning as designed and inclusion of an Emergency Plan.
Applicable Areas:
a) Sanitary Sewer Networks/Pipes:
- WHPA A and B (vulnerability score of 10) - Deloro, Madoc and Tweed;
- IPZ 1 (vulnerability score of 10)- Picton and
- Issues Contributing Area–Tweed.
b) Pumping Stations and STP Storage Tanks:
- IPZ 1 and 2 (vulnerability score of 9 or higher) - Belleville (IPZ 1), Deseronto (IPZ 1), Napanee (IPZ 1) and Picton (IPZ 1 and 2)
- Issues Contributing Area –Tweed.
c) Stormwater Ponds, Effluent Discharges, and By-pass discharges:
- IPZ 1, 2 and 3 (vulnerability score of 8 or higher) - Bayside (IPZ 1), Belleville (IPZ 1 and 2), Deseronto (IPZ 1 and 2), Napanee (IPZ 1 and 2), and Picton (IPZ 1, 2 and 3a).
Effective Date: Within three years of the Plan, or any plan amendment, as applicable, taking effect.