SWP - Policy Interface
Home
Policies
Full Text Policies
Reports/Stats
Home
Policy Edit
Previous Policy
Policy
Next Policy
Policy Id:
SPR/SPA:
Risk:
GC-S-MC-3.3
Grand River
Significant
Implementing Body
Legal Effect
Policy Tool
Threat Type
Status
Comment
MECP - Wastewater/Sewage Works
Conform with
Prescribed Instruments
Existing
Implemented
Based on criteria, the prescribed instrument application may be flagged for a more detailed ‘secondary screening’ to determine if the activity associated with the application is a significant drinking water threat. If yes, the appropriate standard operating policy is applied. As legally required, where a source protection policy that relies on a prescribed instrument to prohibit an activity that is a significant drinking water threat, the ministry is conforming to the policy by refusing to issue an instrument for the activity.
MECP - Wastewater/Sewage Works
Conform with
Prescribed Instruments
Future
Implemented
Based on criteria, the prescribed instrument application may be flagged for a more detailed ‘secondary screening’ to determine if the activity associated with the application is a significant drinking water threat. If yes, the appropriate standard operating policy is applied. As legally required, where a source protection policy that relies on a prescribed instrument to prohibit an activity that is a significant drinking water threat, the ministry is conforming to the policy by refusing to issue an instrument for the activity.
Policy Text:
To ensure any existing or new sewage treatment plant with effluent and/or bypass discharge or new sewage treatment plants with sewage storage tanks ceases to be or never becomes a significant drinking water threat, where such an activity is, or would be, a significant drinking water threat, the Ministry of the Environment shall prohibit these activities within the Environmental Compliance Approvals process for such sewage treatment plants on lands located within identified vulnerable areas.
Monitoring Text:
(GC-S-CW-1.11)Where the Source Protection Plan policies require a provincial ministry to deny an activity with a Prescribed Instrument, the applicable Ministry shall summarize the actions taken the previous year to implement the policies and provide a written report summarizing this information to the Source Protection Authority by February 1st of each year.