SWP - Policy Interface
Home
Policies
Full Text Policies
Reports/Stats
Home
Policy Edit
Previous Policy
Policy
Next Policy
Policy Id:
SPR/SPA:
Risk:
CG-MC-15
Grand River
Significant
Implementing Body
Legal Effect
Policy Tool
Threat Type
Status
Comment
MECP - Wastewater/Sewage Works
Conform with
Prescribed Instruments
Existing
Implemented
The ministry continues to identify and review existing Environmental Compliance Approvals as a result of source protection plan amendments on an annual basis. For those existing instruments that are screened by the Ministry and subject to existing threat prescribed instrument policies, the existing instruments will be reviewed to determine if the Standard Operating Policy can be applied or if amendments are needed to protect municipal drinking water sources.
MECP - Wastewater/Sewage Works
Conform with
Prescribed Instruments
Future
Implemented
Where a source protection plan policy outcome is to manage a significant threat to drinking water sources through the prescribed instrument for sewage works, the ministry is meeting the policy’s obligations by including design and operational measures in an Environmental Compliance Approval. To assist in the implementation of this approach, anyone subject to policy requiring management of a significant drinking water threat is required to include in their application a description of the measures necessary to protect drinking water and submit a ‘Source Protection Supplementary Report’ to outline how the activity for the sewage works will be managed so that the activity will not become a significant drinking water threat. Where a municipality is constructing preauthorized sewage collection or storm water management works under a Consolidated Linear Infrastructure ECA, conditions of the ECA require municipalities to evaluate proposed works for significant drinking water threats and where a significant threat is identified, implement risk management measures according to the ministry's Standard Operating Policy and applicable source protection plan policies.
Policy Text:
For the existing or future discharge from a stormwater management facility within vulnerable areas where this activity is or would be a significant drinking water threat, the Ministry of the Environment, Conservation and Parks shall ensure that the Environmental Compliance Approval that governs the stormwater management facility includes appropriate terms and conditions to ensure that the activity ceases to be and/or never becomes a significant drinking water threat.
Monitoring Text:
(CG-CW-1.11): Where the Source Protection Plan policies require a provincial ministry to undertake an action regarding an activity under the Environmental Compliance Approval process or review, issue, amend or create a new Prescribed Instrument, the applicable Ministry shall provide a copy of the amended or approved Prescribed Instrument to the City of Guelph.
The applicable ministry shall provide a written report summarizing the relevant information to the Source Protection Authority by February 1st of each year.
content goes here